Porterville Unified School District
Porterville Cemetery District
City of Porterville
Longs Drug Store – Porterville
Tule River Indian Reservation – Tule River Tribal Council
Tulare County Housing Authority
Tule River Economic Development Corporation
U.S. Forest Service
Teviston Community Services District
Poplar Community Services District
Ducor Community Services District
Richgrove Community Services District
Bank of the Sierra
Miscellaneous Clients’ Projects
Porterville Unified School District
Granite Hills High School
- Site preparation, drainage plans and technical specifications
- An off-site 18-inch to 30-inch storm drain line
- A 32-acre foot reservoir which is part of the City of Porterville’s Master Plan Facilities
- Enlargement of Tulare County’s storm drain Reservoir No. 26
Sequoia Middle School
- Property survey
- Topographic survey
- Site preparation and drainage plan
^ top
Porterville Cemetery District
Hillcrest Cemetery
- Expansion – including lot layout, road layout, and water distribution
- Storm drainage system and 7-acre storm drain reservoir
Vandalia Cemetery
- Expansion – including lot layout, road layout, water distribution, and new restroom facility
- Property survey
^ top
City of Porterville
Water
- Proposed 500,000 gallon water storage tank in East Porterville
- Water distribution systems, wastewater collection systems, and storm drain facilities in Prospect Street, Indiana Street, Henderson Avenue and Westwood Street
- Design of Well Nos. 17, 18, 19, 20, 26, and 27, including plans, specifications, topographic surveying, contract administration, and construction inspections
- Sludge drying ponds (portion of wastewater treatment improvement project)
- Storm Water Pollution Prevention Plan (SWPPP)
Parking lot improvements
- Storm drainage, irrigation, and landscaping for:
a. Second Street and Olive Avenue
b. Hockett Street and Oak Avenue
c. Second Street, between Thurman and Harrison Avenue
Library improvement plans
- Restroom areas and new flooring
^ top
Longs Drug Store – Porterville
- Property survey
- Site design and planning
- Preparation of drainage plan
- New parking lot development, including drainage, irrigation, lighting, and landscaping
- Redevelopment of existing parking areas to improve circulation, drainage, and landscaping
^ top
Tule River Indian Reservation – Tule River Tribal Council
Cow Mountain Area
- Water distribution system
- Residential Development assignment layout
- Road improvement plans
Fire Station and Public Works Building
- Building design, engineering calculations, details, and project specifications
- Topographic survey, site drainage and grading plan
Miscellaneous Projects
- Septic system design for new assignment parcels
- Engineering calculations and details for casino administration building addition
- Engineering calculations and details for proposed convenience store with fuel islands on Highway 190 at Lake Success
^ top
Tulare County Housing Authority
Mill Creek Parkway Project (40 single family units)
- Site grading/drainage plan
- Private road design and improvement plans
- Water distribution system
- Sewer collection system
- Storm Water Pollution Prevention Plan (SWPPP)
Linnell Labor Camp
- Well construction, including plans, specifications, contract administration, and construction inspection
- Well rehabilitation
Woodville Labor Camp
- Well construction - including plans, specifications, contract administration, and construction inspection
- Swedging of well casing to seal off pollutants
^ top
Tule River Economic Development Corporation
Industrial Park
- Subdivision design
- Water system design, including new on-site distribution, rehabilitation of an existing off-site well and tie into City of Porterville’s airport water system to improve that facility fire flow.
- Sewer collection system on-site and tie in to City’s system
- Storm drainage system, including City’s off-site retention reservoir
- Curb, gutter, sidewalk, and street construction
- Building design, engineering calculations, details, and project specifications for:
a. New TREDC administration office
b. Food distribution warehouse facility
c. U.S. Forest Service command center
^ top
U.S. Forest Service
Porterville Airport Air Attack Base
- Extension of off-site sewer collection system
- Extension of off-site water distribution system
- On-site sewer and water systems
- Plan check services
Peppermint Heliport
- Site topographic survey
- Building design, engineering calculations, details, and project specifications
- Septic system design
- Parking area design and improvement plans
Kernville Heliport (Lake Isabella)
Site topographic survey
Building design, engineering calculations, details, and project specifications
Septic system design
Parking area design and improvement plans
Pinehurst Station
Water transmission system including topographic survey (approximately 1.5 miles long)
^ top
Teviston Community Services District
- Water distribution system, (approximately 17,000 lineal feet)
- Rehabilitation of two (2) pumping plant facilities
- Negotiations with property owners to acquire right of way easements
- Complete contract administration and construction inspection for project
^ top
Poplar Community Services District
- Water distribution system
- 293,000 gallon water storage standpipe facility
- Three (3) water pumping plant facilities
- Wastewater collection system
- Wastewater treatment facility
- Wastewater disposal farm
- Shop facility and storage
- Complete contract administration and construction inspection for the above projects which included project coordination between three (3) separate contractors to accomplish the entire project
^ top
Ducor Community Services District
- Formation of Community Services District
- Two (2) 220,000 gallon storage tanks
- Water distribution system
- Two (2) pumping plant facilities
- Complete contract administration and construction inspection for the above projects which included project coordination between separate contractors to accomplish the entire project
^ top
Richgrove Community Services District
- Water distribution system
- 293,000 gallon water storage standpipe facility
- Two (2) pumping plant facilities
- Wastewater collection system
- Wastewater treatment plant facility
- Wastewater disposal farm and irrigation system
- Complete contract administration and construction inspection for the above projects which included project coordination between three (3) separate contractors to accomplish entire project
^ top
Bank of the Sierra
Preparation of plans for new facilities:
- Hanford, CA branch
- East Bakersfield, CA branch
- Three Rivers branch
Preparation of plans for other branches:
- ATM drive through facilities
a. Three Rivers branch
b. Main branch Porterville, CA
- Parking lot improvements
a. Expansion and storm drainage for West Olive branch, Porterville, CA
b. Landscaping and irrigation system for Main branch, Porterville, CA
Corporate office remodel and expansion
^ top
Miscellaneous Clients’ Projects
Porterville Veterans Memorial District
- 10,000 square foot building, including topographic survey, site preparation, site grading/drainage, sewer collection, water distribution, landscaping and irrigation
- Parcel map and property survey
- Use permit application
- Contract administration and construction inspection
Chelsea Glen Subdivision (55 Lots)
- Topographic survey
- Subdivision design
- Plans and sizing calculations for sewer collection system, water distribution system, and storm drainage lines and retention reservoir
- Complete street improvement plans for curb, gutter, sidewalk, paving, and street lighting
Warehouse Facility
- 50,000 square foot building plans, engineering calculations and details
- Site preparation and improvements, including water, sewer, and storm drainage facilities
^ top